Dienstag, 7. Juni 2016

Leg work

leg number one was ready since months, leg number two was on the waiting list of my "to do in the near future" parts for r2.

i first decided to go the steel way and will continue it now. but the plans for a set in ali are on their way... i already spoke to my buddy at the metal shop. :)

here are the first steps of it; the first parts tack welded together...



as you can see, the openings for the booster system are already there. plans are to build this system too.
therefore i have to do some changes on the booster covers. these must be three parts that open in diefferent directions; one has to slide up, the other two to the left and right.

Keine Kommentare:

Kommentar veröffentlichen