Day two of the ali battery boxes building process.
after bending the first sheet around a tubing (not that easy with 2 mm ali!!) and the second part to get the "steps" into it, welded the backward plate into it and grinded it with 40 grit.
next step is to fix the front plate to the box and weld it on too!
pièces r2d2, r2d2 parts, r2d2 teile, resinteile r2d2, pièces en résine r2d2, resin r2d2 parts, aluminium r2d2 teile, aluminum r2d2 parts, steel parts r2d2, pièces acier r2d2, stahlteile r2d2, baublog r2d2, blog de construction r2d2, construction blog r2d2, r2d2 blog, astromech steel legs, astromech steel battery boxes, astromech steel outer ankles, astromech steel Center ankles, astromech Ali outer ankles, astromech Ali Center ankles, astromech Center foot, astromech Ali battery boxes
Keine Kommentare:
Kommentar veröffentlichen