i finally got for a ridiculous price two big cabinets. i couldn´t resist!
now i have some space to store all my r2 steel and ali sheets and parts!
pièces r2d2, r2d2 parts, r2d2 teile, resinteile r2d2, pièces en résine r2d2, resin r2d2 parts, aluminium r2d2 teile, aluminum r2d2 parts, steel parts r2d2, pièces acier r2d2, stahlteile r2d2, baublog r2d2, blog de construction r2d2, construction blog r2d2, r2d2 blog, astromech steel legs, astromech steel battery boxes, astromech steel outer ankles, astromech steel Center ankles, astromech Ali outer ankles, astromech Ali Center ankles, astromech Center foot, astromech Ali battery boxes
Freitag, 28. Juli 2017
Montag, 24. Juli 2017
Priority
what can i say...
r2 parts have to wait! and me too! :(
after more than two weeks of waiting, my preferred laser cutter metal shop found the time to cut my steel and ali parts.
and what did they do?! they only made one ali foot and one steel foot! are they nuts??!! so a short phone call later everything was cleared and they will make another batch of parts for me.
here is (only) the first of two ali feet in parts, lasercut and ready to be welded together!
now i must find some time to do the metal work on the parts. i am still not finished with the second steel foot (only minor work on it that has to be done).
but at the moment, my main focus is on sandblasting and body work of old cars and motorbikes, scooters and tractors.
actually i am working on a 68 jaguar e type, a 73 dodge challenger, a 66 nsu prinz tts and several vespa scooters from the 70´s and 80´s. plus all the industry stuff they give me in between... :(
r2 parts have to wait! and me too! :(
after more than two weeks of waiting, my preferred laser cutter metal shop found the time to cut my steel and ali parts.
and what did they do?! they only made one ali foot and one steel foot! are they nuts??!! so a short phone call later everything was cleared and they will make another batch of parts for me.
here is (only) the first of two ali feet in parts, lasercut and ready to be welded together!
now i must find some time to do the metal work on the parts. i am still not finished with the second steel foot (only minor work on it that has to be done).
but at the moment, my main focus is on sandblasting and body work of old cars and motorbikes, scooters and tractors.
actually i am working on a 68 jaguar e type, a 73 dodge challenger, a 66 nsu prinz tts and several vespa scooters from the 70´s and 80´s. plus all the industry stuff they give me in between... :(
Sonntag, 2. Juli 2017
Second outer foot
Last friday i intended to do some more work on foot number two.
Too much work, a lot of customers and a messy and dirty enterprise avoided it!
So after all customers were gone and the enterprise was all cleaned up, the day was over!!
So the next day was yesterday; only a few customers visited me.
That gave me the chance to build foot number two.
Here are almost all of the parts laid onto the (clean) workbench:
Too much work, a lot of customers and a messy and dirty enterprise avoided it!
So after all customers were gone and the enterprise was all cleaned up, the day was over!!
So the next day was yesterday; only a few customers visited me.
That gave me the chance to build foot number two.
Here are almost all of the parts laid onto the (clean) workbench:
Abonnieren
Posts (Atom)