After a quick visit this morning at the metal shop, i could pick up some Ali sheets to start with the First parts for the legs.
Here is what i made so far this morning:
The lower end of the Ali leg got a cover.
Then i cut out two half moon Sheets...
After welding them to the lower end...
I made a small stripe...
And welded it over the two half moons, then grinded everything.
Keine Kommentare:
Kommentar veröffentlichen