for better access to the screw/nut of the outer feet, i added a small detail in the construction.
there will be a nut welded into the tunnel and on the opposite side there will be an opening to get the tools onto the screw.
here is what i mean:
the upper sheet shows one of the first designs i had. the arrows show the significant changes in design.
the upper hole is closed now (it was for the cables. this isn´t necessary anymore due to hollow screws and ball bearings in the ankles. so the cables aren´t visible anymore).
there was an error in design; the two left upper arrows show the area, that was straight in the beginning and afterwards (on the lower sheet) rounded to get a better line when welding the parts together (there was a gap).
the inner opening was enlarged to get other foot drives than the npc in it.
the next step will be to get an even larger opening than it is actually, because still not every drive system fits in perfectly.
as well there will be soon a CS:R version of the feet with a lower final sheet frame.
pièces r2d2, r2d2 parts, r2d2 teile, resinteile r2d2, pièces en résine r2d2, resin r2d2 parts, aluminium r2d2 teile, aluminum r2d2 parts, steel parts r2d2, pièces acier r2d2, stahlteile r2d2, baublog r2d2, blog de construction r2d2, construction blog r2d2, r2d2 blog, astromech steel legs, astromech steel battery boxes, astromech steel outer ankles, astromech steel Center ankles, astromech Ali outer ankles, astromech Ali Center ankles, astromech Center foot, astromech Ali battery boxes