Luckily i could do more work on the second ankle today.
Only a gold friend came to me working on his VW beetle.
So the ankle is ready for a (sand-) blast and a coat of primer before pressing in the ball bearings.
Here a pic before drilling the holes for the capsuled ball bearings...
And Yes, the ali ankle cylinder fits perfect!
pièces r2d2, r2d2 parts, r2d2 teile, resinteile r2d2, pièces en résine r2d2, resin r2d2 parts, aluminium r2d2 teile, aluminum r2d2 parts, steel parts r2d2, pièces acier r2d2, stahlteile r2d2, baublog r2d2, blog de construction r2d2, construction blog r2d2, r2d2 blog, astromech steel legs, astromech steel battery boxes, astromech steel outer ankles, astromech steel Center ankles, astromech Ali outer ankles, astromech Ali Center ankles, astromech Center foot, astromech Ali battery boxes
Keine Kommentare:
Kommentar veröffentlichen