i had a really hard week. 70 hours of hard work on seven days. so no free weekend this week.
but i could realize a lot of work in my new room.
here are some pics to it:
the walls got some plaster onto their gaps...
and of course i had to sand them after the plaster was dry.
after this i bought some new material for the floor construction.
my son helped me a lot that weekend...
The freshly built Floor construction:
here we added some insolation material to the wooden floor construction...
and later that day we already could screw the wooden panels onto the construction...
the entrance area needed a ramp. so we added some concrete to it:
my neighbour cut the multiplex panels into two 1,70 m long pieces.
pic will follow
and the six feet got their 98 cm length too...
pic will follow
we bought a cheap dark grey industrial carpet for the floor and some white paint and a chemical fixer for the walls.
pic will follow
for having enough place, my neighbour cut me two 1,70 m long and 40 cm deep panels from a red coated chipboard. these will be mount above the workbench.
pic will follow
maybe we will build another table panel from the remaining multiplex panel sheets...we will see...
pièces r2d2, r2d2 parts, r2d2 teile, resinteile r2d2, pièces en résine r2d2, resin r2d2 parts, aluminium r2d2 teile, aluminum r2d2 parts, steel parts r2d2, pièces acier r2d2, stahlteile r2d2, baublog r2d2, blog de construction r2d2, construction blog r2d2, r2d2 blog, astromech steel legs, astromech steel battery boxes, astromech steel outer ankles, astromech steel Center ankles, astromech Ali outer ankles, astromech Ali Center ankles, astromech Center foot, astromech Ali battery boxes