Dienstag, 28. April 2020

Hard week or what can be done on one day...

i had a really hard week. 70 hours of hard work on seven days. so no free weekend this week.
but i could realize a lot of work in my new room.

here are some pics to it:

the walls got some plaster onto their gaps...



and of course i had to sand them after the plaster was dry.

after this i bought some new material for the floor construction.

my son helped me a lot that weekend...


The freshly built Floor construction:


here we added some insolation material to the wooden floor construction...


and later that day we already could screw the wooden panels onto the construction...



the entrance area needed a ramp. so we added some concrete to it:



my neighbour cut the multiplex panels into two 1,70 m long pieces.

pic will follow

and the six feet got their 98 cm length too...

pic will follow

we bought a cheap dark grey industrial carpet for the floor and some white paint and a chemical fixer for the walls.

pic will follow

for having enough place, my neighbour cut me two 1,70 m long and 40 cm deep panels from a red coated chipboard. these will be mount above the workbench.

pic will follow

maybe we will build another table panel from the remaining multiplex panel sheets...we will see...   