Some Progress here...
The window is at its place.
Next wete the gaps between the Wall Sheets...filling them up and sanding...
The Floor had to be done, too. A wooden ground structure...
Some isolation Material was added too...
Looking shabby and dirty because of laying around in my enterprise for years now, but will do what they have to do.
Next the Floor Panels:
The ladder was fixed too after getting a wooden rear Panel Cover.
The entrance area got a concrete ramp:
pièces r2d2, r2d2 parts, r2d2 teile, resinteile r2d2, pièces en résine r2d2, resin r2d2 parts, aluminium r2d2 teile, aluminum r2d2 parts, steel parts r2d2, pièces acier r2d2, stahlteile r2d2, baublog r2d2, blog de construction r2d2, construction blog r2d2, r2d2 blog, astromech steel legs, astromech steel battery boxes, astromech steel outer ankles, astromech steel Center ankles, astromech Ali outer ankles, astromech Ali Center ankles, astromech Center foot, astromech Ali battery boxes
Keine Kommentare:
Kommentar veröffentlichen