i had to do some additional home work in the shed. room number one was ready, room number two still needed some attention technically.
one window had to be repaired, the hinges for the door must be sandblasted, primered and painted.
so today is sandblasting time or the hinges only.
this means...maybe no time for beginning with the outer feet sheet metal work for r2 and finishing the welding work on leg number two...
let´s see what time will bring...
pièces r2d2, r2d2 parts, r2d2 teile, resinteile r2d2, pièces en résine r2d2, resin r2d2 parts, aluminium r2d2 teile, aluminum r2d2 parts, steel parts r2d2, pièces acier r2d2, stahlteile r2d2, baublog r2d2, blog de construction r2d2, construction blog r2d2, r2d2 blog, astromech steel legs, astromech steel battery boxes, astromech steel outer ankles, astromech steel Center ankles, astromech Ali outer ankles, astromech Ali Center ankles, astromech Center foot, astromech Ali battery boxes
Keine Kommentare:
Kommentar veröffentlichen